MELBOURNE CENTRAL – At Melbourne central we undertook the task of installing 280 Extenzo panels in the heritage atrium, running from the glass dome to Level 3, 9.3 metres down. The main difficulty was that the public space below had to remain in operation, so it was decided to install the panels after hours, when all the the shops had closed. The works took place over 3 months and have become a most striking feature of the heritage atrium combining the old with the new.